M1Motion by Breyen to close the Public Hearing; 2nd by Rainville.
moved by Breyen, seconded by Rainville
- YPilon
- YBlake
- YBreyen
- YGreenberg
- YRainville
Wednesday, December 9, 2020 · 6:00 PM
Agenda
Not posted
What was on the agenda.
Packet
Not posted
The supporting materials council reviewed.
One-line summary
The City Council held two December 9, 2020 road improvement public hearings, one for Ebony & Garnet Streets and one for the Rogers Lake Area, took resident questions on project scope, assessments, drainage, bidding, and timing, and closed both hearings by unanimous roll-call votes.
2 items as recorded in the minutes, each with a plain-English summary of what was at issue.
A1Ebony & Garnet Streets road improvement public hearing
Public road improvement hearing for Ebony & Garnet Streets between 185th Ave and 189th Ave.
The Council held a public improvement hearing on the proposed 2021 reconstruction of Ebony and Garnet Streets between 185th Ave and 189th Ave. Engineer Shane Nelson described reclaiming the existing bituminous surface, adding aggregate and new pavement, addressing subgrade and drainage problems, and assessing 50 percent of the estimated pavement replacement cost to 20 benefitting properties. Residents asked about the certainty of the design, past road failures, driveway grades, garbage-truck wear, drainage ditches, mailboxes, timing, and warranties. The City Attorney reminded residents that the point of no return would come later, when a contract is awarded. The only vote recorded at this hearing was to close the public hearing.
Public hearing was held and closed; these minutes do not record an order for the improvement or award of a contract.
A2Rogers Lake Area road improvement public hearing
Public road improvement hearing for 183rd Lane, 184th Ave, 185th Lane, Salish Circle, Ventre Street, and small portions of Waco St and Yakima St in the Rogers Lake Area.
The Council held a public improvement hearing on the proposed 2021 Rogers Lake Area road project covering 183rd Lane, 184th Ave, 185th Lane, Salish Circle, Ventre Street, and small portions of Waco Street and Yakima Street. Engineer Shane Nelson described reclaiming existing pavement, replacing road culverts, paving to 3 1/2 inches, matching driveways, and keeping the existing 20-foot road width. The estimates presented included a total project cost, a separate 185th Lane gravel-to-pavement upgrade cost, and proposed per-unit assessments. Residents asked about the assessment amount, bid process, lowest-bid requirements, whether homeowners would vote, city versus county funding, and why taxes cover only part of road reconstruction. The only vote recorded at this hearing was to close the public hearing.
Public hearing was held and closed; these minutes do not record an order for the improvement or award of a contract.
2 motions on the record. Split votes are highlighted.
M1Motion by Breyen to close the Public Hearing; 2nd by Rainville.
moved by Breyen, seconded by Rainville
M2Motion by Rainville to close the Public Hearing; 2nd by Blake.
moved by Rainville, seconded by Blake
Documents and recordings archived for this meeting, when available.
The structured brief on this page is auto-generated and may need correction. The PDFs and the meeting recording remain the official record. What do the trust labels mean?